RFP: Ninth St. Basin Water Quality Retrofit Project. No. 2101

Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project:

Project Name: Ninth Street Basin Water Quality Retrofit Project No. 2101                          

Owner: City of Wenatchee

Bid Closing Date: April 22, 2024, 10:00 AM

Subcontractor/Supplier Quote Due Date: April 21, 2024

DBE Condition of Award Goal: N/A

Project Duration: 95 Working Days

Bids to be submitted to: estimating@johansencci.com or via fax at (360) 829-5473

Point of Contact: Questions you have for JCC can be emailed to: estimating@johansencci.com, or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department.

Project Description: This project goal is to improve the water quality of the Columbia River by providing treatment for the Ninth Street Basin and rerouting the City’s stormwater flows away from the No. 2 Canyon Drain. In addition to treatment, this will maintain the current capacity and availability for future development of the Ninth Street Basin and address problems with sediment build-up in the No.2 Canyon Drain.

The project involves a new stormwater conveyance system through Morris Street, Ringold Street, Seventh Street, and Princeton  Avenue before reconnecting to the existing storm system within Ninth Street. Stormwater flows from Ninth Street and the Wenatchee Valley College will be detained by an R-Tank subsurface detention modular system and then treated with StormFilter media cartridges. The existing open channel of No. 2 Canyon Drain will be rerouted through a piped system via Ringold Street and Seventh Street.

Subcontractor/Supplier Opportunities Include (but are not limited to): clearing & grubbing, erosion control, traffic control, asphalt milling, HMA paving, striping/channelization, material hauling, permanent signage, electrical, survey, temporary fencing, landscaping, shoring flatwork concrete. As well as the supply of ready-mix concrete, pipe/utilities/precast structures, aggregate, temporary shoring, and disposal.

JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project. 

Bid Documents can be viewed at:

www.wenatcheewa.gov/e-plans or www.questcdn.com

Closing Date: 
Monday, April 22, 2024