Jefferson County, WA Elevator Modernization Project

Bid Number: 2024TBD

Bid Title: Jefferson County Courthouse Elevator Modernization Project

Category: Facilities Bid Opportunities

Status: Open

Bid Recipient: Jefferson County Board of County Commissioners

Description: CALL FOR BIDS

Modernization of the elevator system inclusive of mechanical and electrical components being replaced, refurbished or retained to increase reliability, improve fire and life safety features, decrease waiting time, reduce energy consumption, reduce yearly operational cost and troubleshooting.

County Project No. 3012TBD

Bid Notice: Notice is hereby given that the Board of County Commissioners of Jefferson County, State of Washington, will receive sealed bids until 2:00 PM on Thursday June 20th at 2:00 PM at the Office of the County Commissioners, basement level of the Jefferson County Courthouse, 1820 Jefferson Street, P.O. Box 1220, Port Townsend, Washington, 98368, for modernization of the Jefferson County Courthouse Elevator, County Project No. 3012TBD. Sealed bids will be opened and read publicly shortly after 2 p.m., in the Jefferson County Commissioners Chambers, basement level of the Jefferson County Courthouse. Interested persons can attend the bid opening.

Scope of Work: This Contract provides modernizing the Jefferson County Courthouse elevator. It’s an existing elevator that was modernized years ago and is a Geared (Traction), 200fpm, 4000 lb. capacity, 4 Stops (4 front/0 Rear) elevator with swift controls. This bid is inclusive of contractor to managing and coordination of all subcontractors, inclusive of but not limited to suppliers, Engineering, Electrical, HVAC, Smoke Sensors or Fire System Alarm, Rigging and/or Other to provide a turn key product for Jefferson County. Jefferson County will not be responsible for any of the contractor’s subcontractor management or direction. Contractor to submit for approval and payment periodic key task completions upon contract award, including mobilization. Key tasks must be submitted for review and approval by Jefferson County prior to equipment fabrication for the upgrade. Additional work/tasks are included but not limited to Exhibit “A”. There is no Engineer’s Estimate.

On Site Visit: There is a mandatory on-site visit required to bid on this project. The dates available are Wednesday, May 8th at 9:00 AM or 2:00 PM and Thursday, May 23rd at 9:00 AM or 2:00 PM. Please contact Ben Johnson at 360-531-1743 to sign up for a date and time. All questions are to be sent to bjohnson@co.jefferson.wa.us All questions to be submitted for response on or before June 13, 2024.

Schedule: The durations and lead time is to be submitted by the contractor with the bid. Timeline to be listed in calendar weeks, i.e. 1-week lead time, 2 weeks to complete, etc. Contractors Schedule to be included in the bid proposal. Work must be completed prior to November 1, 2025. The will be a $100 fee per day compensation to Jefferson County for late completion.

Warranty: Contractor warrants any equipment it installs against defects in material and workmanship for a period of one (1) year from the date of the Final Acceptance from Jefferson County. Warranty language to be included in the bid proposal.

Preventative Maintenance Program: Contractor to include option for preventative maintenance service in the bid proposal. Option to be provided during normal working hours. To include rates of pay for labor and recommendations for service and monthly, quarterly or yearly cost associated as recommended.

Exclusions: Contractor to identify work, access and/or equipment that Jefferson County would provide, inclusive of but not limited to Hoistways and Equipment Rooms, Electrical and Life Safety, Working Hours, Logistics, IT Cloud based platform, etc. Contractor to identify work that would NOT be included in the elevator modernization upgrade for the Jefferson County Courthouse in bid proposal.

Bid Documents: Bids must be submitted in accordance the requests in this document. The bid document submitted by the contractor shall be inclusive of the following; cover letter, scope of work; schedule/timeline; warranty; preventative maintenance plan; work not included; working hours; Cost for Temporary use, Inspection and Turnover; IT Platform you will use for elevator; past 5 years project list; mobilization costs; and 9.4% tax with total cost. All bid information will be available on the Jefferson County Website https://www.co.jefferson.wa.us/Bids.aspx

Each bid shall be accompanied by a surety bond, postal money order, cash, cashier’s check or certified check payable to the Treasurer of Jefferson County in the sum of five (5%) percent of the bid amount, to be forfeited to Jefferson County by the successful bidder if he/she fails to enter into a contract and file an acceptable Project Surety bond in the amount of 100% of the contract price within ten (10) calendar days of the award. The Board of County Commissioners reserves the right to reject any and all bids and to accept the bid deemed most advantageous to Jefferson County and to waive all informalities in the bidding.

The Jefferson County Public Works, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Publication Date/Time: 04-18-2024 2:00 PM

Jefferson County Website, OMMBE, DJC

Exhibit “A”

Scope of Work

 

Controller

-

Shaker Box (For Group)

-

TAC 32T Controller (Includes options listed below)

  • 24 VDC Signal Voltage
  • Auto Light and Fan Feature
  • Car Independent Service
  • Car Traveling Lantern Circuitry
  • Door Bypass Operation
  • Electronic Door Detector Interface
  • Hoistway Access and Enable
  • THY Board

-

eMax Monitoring Device Provisions

-

tkE Green Drive 400C (2109CD004) VVVF AC Drive / Regenerative 30R

-

Seismic Operation / Counterweight Derailment

-

Tenant Security Option

-

Regen Disable (DB Resistors for Emergency Power)

-

Emergency Power (10-D-4A)

-

Machine Room Wiring Package

-

Remote BCC and Separate Machine Room Wiring for 2019 Code

-

BCC Panel for Two-way Communication

-

Two-way Communication Machine Room Equipment (Primary Box)

 

Machine

-

Traction Layout - Machine Room Only (Overhead)

-

Hoist Cables, traction steel, preformed

-

Seismic Bedplate

-

Hollister Whitney 54 Geared Machine 40HP Imperial AC Motor includes:

  • Encoder
  • Brake switch
  • Traction Sheave and Guard
  • Deflector Sheave and Guard (if applicable)
  • Machine Block up Assembly
  • Isolation

-

Hollister Whitney Machine Isolation Seismic Add (44,54,64)

-

Acculube rope lubricators and mounting brackets

-

HW Rope Gripper Model 626 with Standard Plate

 

Governor

-

Governor/Safety Accessory Kit

-

12" Governor without Encoder (includes Tail Sheave)

-

Governor Rope

-

Rope Retainers and tail weight tie down for Seismic Conditions

 

 

 

 

Exhibit “A”

Scope of Work Continued

 

Car

-

Retainer plates for car sling (set of 4)

-

Retainer plates for counterweight (set of 4) for TKE or Elsco guides only

-

Car Guide shoe mounting plates (set of 4 - only with shoe purchase from tkE)

-

8" Car roller guides (set of 4) tkE (spring loaded)

-

Crosshead data tag (for existing car slings)

-

Car Top Railing

-

Car Top Railing Extension (Depth)

-

Car Top Railing Extension (Width)

-

Toe Guard for 2000 code (48")

-

tkE Cable Strain Loadweigher (for 5 ropes)

-

Fan: Two Speed

-

5 Pin Lock with electric contact for Car Top Exit

-

Two-way Communication Camera (dome), Ethernet Extender (kit), & Battery Backup

-

Cab Wiring Material (200MK1)

 

Hoistway

-

Hoistway Duct Kit (per run)

-

Base Wiring Package for 2019 Code

-

TAC 32T Field Friendly Wiring Package:

  • Includes single flat traveling cable with coax
  • hoistway wiring
  • interlock wiring
  • interlock connectors
  • discrete wiring
  • FIBER OPTIC CABLE, HOISTWAY PIPING & DUCT ARE NOT INCLUDED.

-

Alarm Bell (for hoistway)

-

APS (Absolute Positioning System) for TAC32T with Final Limit Switches

 

Pit

-

4" Cwt roller guides (set of 4) tkE (spring loaded)

-

Counterweight Derailment detector (ring and string)

-

Pit Stop Switch

-

Pit Ladder 16'' Wide

 

Cab

-

Car Door (SSSS, #4 Muntz)

 

Door Equipment

-

Hoistway Door Escutcheons

-

Interlock / Pick up Assemblies for existing Dover Operators. Includes closers. (Front)

-

Micro Light 3D 2019 (Front)

-

LD-16 Plus Door Operator with Complete carside equipment (FRONT)

  • includes Adapter kit (Tracks & Hangars), Clutch (w/ Car Door Lock latch & contact),

& Car Top Inspection station (w/ alarm signal)

-

3D Cabsafe Components Package (Front)

 

 

 

 

Exhibit “A”

Scope of Work Continued

 

 

 

Car Fixtures

-

Smart Rescue Phone 5 Standalone

-

Main Car Station Includes Options Below

-

  • Applied Panel

-

Vandal Resistant Floor Buttons

-

Panel Screws

-

Debranded Car Station (No Logo)

-

Cast Braille Plates for Car Features

-

Standard Key Switch Package

  • Fan
  • Light
  • Independent
  • Stop
  • Inspection/Hoistway Enable)

-

Emergency Light mounted in COP

-

2004 and later Fire Service Phase II Features (includes instructions signage)

-

Handicap Signal (Passing signal)

-

Two-way Communication Position Indicator

-

ADA Phone System integral with COP (Rath)

-

Speaker Pattern for Intercom System/ADA Phone

-

Locked Service Cabinet

-

Default Engravings

-

GFI Outlet

-

#4 Muntz Bronze Finish

-

Seismic Operation Jewel

-

Emergency Light Test Button

-

Voice Annunciator (mounted in COP)

  • Standard features only
  • additional costs apply for custom features

-

TAC Serial Boards (Main)

-

Card Reader Provisions (Space only)

-

Car Riding Lantern (Vandal Resistant) #4 Muntz

 

Hall Fixtures

-

Hoistway Jamb Braille (Pair of Standard) (# of Floors)

-

Terminal Hall Stations (Surface Mounted) with

  • Appendix O (Polycarbonate insert flame)
  • Fusion (#4 Muntz)

-

2009 & 2010 Elevator Communications Failure add

-

Terminal Hall Stations (Surface Mounted) with

  • Appendix O (Polycarbonate insert flame)
  • Fusion (#4 Muntz)

-

Intermediate Hall Stations (Surface Mounted) with

  • Appendix O (Polycarbonate insert flame)
  • Fusion (#4 Muntz)

 

 

Exhibit “A”

Scope of Work Continued

 

 

 

Multimedia Monitoring Service

 

The latest versions of both ASME A17.1 and the International Building Code now require the Purchaser to have video and text messaging capabilities added within the elevator cab for all elevators. TK Elevator's Multimedia Monitoring Service satisfies the Purchaser’s obligation to meet these new code requirements as outlined in the attached Service Agreement Addendum entitled "TK Elevator Communications."

 

Activation of Multimedia Monitoring Service is contingent on signed acceptance of this proposal and acceptance of the attached, ongoing Service Agreement Addendum that defines the pricing and scope for the ongoing application services.

 

The latest versions of both ASME A17.1 and the International Building Code now require the Purchaser to have video and text messaging capabilities added within the elevator cab for all elevators. TK Elevator's Multimedia Monitoring Service satisfies the Purchaser’s obligation to meet these new code requirements as outlined in the attached Service Agreement Exhibit entitled "TK Elevator Communications." This service will run concurrently with the Preventative Maintenance period provided in this Proposal.

 

The cost of Multimedia Monitoring service is included in the price of this Proposal. Continued service is contingent on Owner's signed acceptance of an ongoing Service Agreement which includes the pricing and scope for the ongoing application services.

 

END

Closing Date: 
Thursday, June 20, 2024
Organization: 
Jefferson County Washington
Point of Contact: 
Ben Johnson; bjohnson@co.jefferson.wa.us